Over 150,000 s.y. of
erosion control blankets were specified to be installed in Arapahoe County, CO. To meet Federal guidelines of the Clean Water Act, dirt contractors must install
erosion control products to meet NPDES Phase II regulations.
Erosion control measures virtually eliminate surface waters from carrying site soils into our storm systems during construction phase; Vitally important to ensuring our rivers and streams don't get choked-off with silt and top soils.
Watersaver Company is proud to have been selected the supplier of these products.